Marine Rail System Additions

Roads and Bridges

Rognlin’s supported the Port of a Grays Harbor with a two-phase rail system upgrade within the Port's Industrial Area for AGP Dump Building #2. Phase 1 included construction of 9,000 feet of new rail line on concrete ties along with culverts and sub grade preparation to support new rail grade. Phase 2 included an additional 28,000 feet of railway, 18 turnouts, several crossings, drainage structures, stormwater runoff appurtenances, and some grade changes at crossings.

‍

Client

Owner

Port of Grays Harbor

PROJECT COMPLETION

2011 (Phase 1) / 2012 (Phase 2)

CONTRACT VALUE

SUBCONTRACT VALUE

$2,878,853.60 (Phase 1) / $11,114,528.31 (Phase 2)