Ongoing erosion along the banks of the Lower Chehalis River has threatened a Port of Grays Harbor haul road for many years, after removal of a railroad track that had previously buffeted the road from a wide bend in the river. The Port undertook a multi-phase project to add stream bank protection measures. Rognlin’s supported the Phase 2 work, which added protection to 500-feet of stream bank. We developed, maintained, and decommissioned a project staging area; cleared the site; furnished and installed ballasted log jacks and log triangles placed above and below water; reshaped the embankment with gravel, cobble, and slash above and below water; and added temporary erosion and sediment control. We also managed traffic control and signage,and provided site restoration and planting after installation of the protection measures was complete.

‍

Client

Port of Grays Harbor

Owner

Aaron Aschim

PROJECT COMPLETION

2023

CONTRACT VALUE

SUBCONTRACT VALUE

$1,378,322.12

Previous project
Next project
Hire a professional
Make an appointment with a Webflow Professional to build a website using this template. Learn More